
Our tentative trail opening is May 7 as listed on the VASA trails opening list at www.vtvasa.org. A BMAC trail work crew will be scheduled before that.
May 7 is Green Up day, bring a garbage bag and clean up the roadsides around the Trail head. Then, the Trail Coordinator and club President will determine if the trail surfaces are ready for ATV traffic.
You have to be a 2011 VASA member to ride the VASA clubs trails.

No comments:
Post a Comment
Note: Only a member of this blog may post a comment.